Home / Additions & ADUs / Baldwin Park
Additions & ADUs · Baldwin Park, FL

Home Additions in Baldwin Park, FL

Room additions, second stories, in-law suites and ADUs in Baldwin Park — engineered, permitted and built from foundation to finish by one licensed team.

Licensed & insured · Lic. #CGC1539321
By Vladimir Svirsky, President · Updated
Local permits & inspections handled
Written estimate, no obligation
Serving Baldwin Park from Oviedo

Free Additions & ADUs Estimate

We typically reply the same business day.

✔ Lic. #CGC1539321
✔ Permits & inspections handled
✔ 433+ projects completed
★ 5.0★ on Google (7 reviews)
✔ Licensed & Insured

Home additions in Baldwin Park, FL: Right Image Inc (Right Image Builders) is a licensed and insured Florida general contractor (CGC1539321) based in Oviedo, building room additions, second stories, in-law suites, garage conversions and ADUs across Baldwin Park and Orange County — structural engineering, permitting and construction under one contract.

Additions & ADUs in Baldwin Park, FL — planning ranges (updated October 2026): Room addition $40,000 – $120,000 · Second-story addition $150,000 – $300,000+ · ADU / garage conversion $50,000 – $180,000. Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. Permits run through City of Orlando Permitting Services. Ranges are planning figures, not a quote — every project is priced after a site visit.

Key facts

Additions & ADUs in Baldwin Park at a glance

Planning range
Room addition $40,000 – $120,000; Second-story addition $150,000 – $300,000+; ADU / garage conversion $50,000 – $180,000 (updated October 2026; not a quote)
Typical time
about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer
Permits
City of Orlando Permitting Services. Baldwin Park is part of the City of Orlando — permits go through the City of Orlando.
ADUs
Yes — permitted use — City of Orlando ADU rules
Wind and flood
Outside the High-Velocity Hurricane Zone (Broward and Miami-Dade only); wind design is set per address. Check the flood zone on the FEMA flood map. More in the codes and flood FAQ.
Licence and reviews
Florida certified general contractor CGC1539321 (DBPR: current, active, expires 08/31/2028) · 5.0★ on Google (7 reviews, Oct 2026)
Next step
Free written estimate: call (407) 993-6889 or use the form on this page. Planning help: guides and FAQ.

More space, matched to your home and your local code

Adding on is the most structural work a home can undergo — foundation, framing, roofline, and tie-ins all have to be engineered and permitted correctly. We manage the whole process, from feasibility and design through permits and final finishes.

Additions and accessory dwelling units (ADUs) are handled differently by each jurisdiction — the rules change between each city and the unincorporated parts of Seminole, Orange and Osceola counties. We build to what actually applies to your Baldwin Park lot.

Additions & ADUs · Baldwin Park

What we handle on a home addition in Baldwin Park

01

Room & primary-suite additions

Add a bedroom, primary suite, or great-room bump-out with a foundation and roofline that match the existing home.

Mother-in-law suites: attached suites for multigenerational living →

02

Second-story additions

Build up when you can't build out — engineered for the existing structure and Florida wind loads.

Second-story additions: engineering, timeline and planning range →

03

ADUs & in-law suites

Detached or attached accessory units and garage conversions for multigenerational living or a home office, built to local code.

ADU builder: rules by city, planning range and permits →

Garage conversions: permits, parking and what it takes to make a garage livable →

04

Engineering & permits

We coordinate the structural engineering, permitting, and any HOA/ARB review so the addition is legal and lasting.

Baldwin Park, Orange County

What a home addition in Baldwin Park involves

We work throughout Baldwin Park — from Village Center and New Broad Street to Enclave, Lake Baldwin. Baldwin Park is a New Urbanist community on the former Orlando Naval base, built in the 2000s, and it sits in Orange County, part of the Greater Orlando area we cover from our base in Oviedo.

Permitting for a Baldwin Park home addition goes through City of Orlando Permitting Services. Baldwin Park is inside the City of Orlando, so plan review and inspections go through City of Orlando Permitting Services rather than a separate local office. We file there directly on your behalf.

Alongside Baldwin Park, we regularly take on work in nearby communities including Orlando, Winter Park, Maitland and Altamonte Springs.

Every Baldwin Park home addition we take on is run by the same licensed general contractor (CGC1539321) that pulls the permit — so there is one point of accountability from the first walkthrough in Village Center or New Broad Street through final inspection with City of Orlando Permitting Services.

Baldwin Park housing

What we see in Baldwin Park homes

Baldwin Park was built from 2003 on the former Orlando Naval Training Center as a New Urbanist community: alley-loaded homes, townhomes and condos with a strong architectural review board. Exterior changes need ARB approval as well as a City of Orlando permit. For additions and ADUs, it means confirming the zoning, setbacks and any HOA or architectural review for your specific lot before design starts.

Baldwin Park

Can you build an ADU in Baldwin Park?

The City of Orlando allows one ADU per lot — attached, detached, above a garage or as a garage conversion — in all R and MXD districts and in O-1 and O-2, subject to minimum lot size. It is a permitted use, with appearance review alongside the building permit. Long-term rental is allowed and there is no owner-occupancy rule, but both units stay under one owner, and the ADU needs its own electric and water meters and a full kitchen.

Source: Orlando City Code Ch. 58, Part 3A (Secs. 58.500–58.501), per the city's ADU guide, City of Orlando (checked October 2026). Rules change, and HOA covenants can be stricter than the code; we confirm both for your parcel before design.

ADU rules by city (2026) →

Timeline

How long a home addition takes in Baldwin Park, stage by stage

Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. The stages are the same for every addition we build across Greater Orlando; what changes is the size of the job and the review time at your building department.

  1. Site visit and feasibility — we measure, check the slab, roof, electrical panel and plumbing, and confirm the zoning setbacks and any HOA or architectural review for your lot.
  2. Design — a floor plan and elevations matched to the house, then a written, itemised estimate.
  3. Structural engineering — sealed drawings for the foundation, the roof tie-in and the wind design for your address, plus energy calculations.
  4. Permit review — the set goes to City of Orlando Permitting Services; we answer any review comments, and the written schedule you get with the estimate builds in that turnaround.
  5. Construction — foundation, framing, the roof tie-in and dry-in, then the trades, insulation, drywall and finishes.
  6. Inspections and close-out — every inspection scheduled by us, the permit closed, and a final walkthrough with you.
At a Glance

Additions & ADUs in Baldwin Park — the local details

City
Baldwin Park, FL
County
Orange County
Permit authority
City of Orlando Permitting Services
Jurisdiction note
Baldwin Park is part of the City of Orlando — permits go through the City of Orlando.
Neighborhoods served
Village Center, New Broad Street, Enclave, Lake Baldwin
Contractor license
CGC1539321 — licensed & insured Florida general contractor
Local Knowledge

Additions & ADUs in Baldwin Park

Baldwin Park is a New Urbanist community on the former Orlando Naval base, built in the 2000s. We cover all of Baldwin Park — Village Center, New Broad Street, Enclave, Lake Baldwin — and the surrounding Orange County area, with plans filed through City of Orlando Permitting Services.

Neighborhoods we serve in Baldwin Park

Village Center New Broad Street Enclave Lake Baldwin

Serving all of Baldwin Park and the surrounding Orange County area.

Permits in Baldwin Park

Permit authority: City of Orlando Permitting Services

Baldwin Park is part of the City of Orlando — permits go through the City of Orlando. We pull the permits and manage the inspections as part of your project.

County: Orange County

Examples

Additions & ADUs — finish & layout examples

Finish and layout examples for additions & ADUs. Photos of completed projects are being added.

Detached accessory dwelling unit with stucco and cedar siding, its own entry and a paved walkway — Additions & ADUs example
Garage converted into finished living space with a new entry door and windows — Additions & ADUs example
Google reviews

5.0★ on Google · 7 reviews

Quoted word for word from our Google Business Profile (Oct 2026). Reviewers name the work; we add nothing.

★★★★★
Right Image Inc. built my ADU and installed a new roof, and I’m very pleased with how everything turned out. Vladimir and his team were easy to work with, answered my questions, and paid attention to the details. Thank you for helping bring this project to life!
Antonio R. — Google review, Oct 2026 · ADU & new roof
★★★★★

Thank you, Right Image Inc., for our new roof, stucco, and bathroom remodel! Our home looks refreshed, and we’re very happy with the results. Vladimir and his team were helpful throughout the project and took care of the details. We appreciate your hard work and highly recommend your services!

Elcira S. · Google, Oct 2026 · new roof, stucco & bathroom remodel
★★★★★

Excellent service at a reasonable price! They repaired a roof leak around a pipe vent, and I’m very happy with the work. I appreciate their help and would highly recommend them to anyone needing a roof repair.

Victor · Google, Oct 2026 · roof leak repair
Planning Ranges

Additions & ADUs in Baldwin Park: what it typically costs

Typical planning ranges for a Baldwin Park addition or ADU. Planning ranges only, not a quote — final pricing depends on size, foundation and site.

ProjectTypical rangeNotes
Room addition$40,000 – $120,000Size, foundation, finishes
Second-story addition$150,000 – $300,000+Structural reinforcement, new stair, roof
ADU / garage conversion$50,000 – $180,000Detached vs. conversion, utilities, kitchen/bath

These are typical planning ranges — not a quote. Every project is priced after we see the space. Permit and inspection fees charged by City of Orlando Permitting Services are separate and vary by scope, and we itemise them for your Baldwin Park estimate rather than burying them in a lump sum.

What moves the price of a home addition

  • Square footage and layout — the number of rooms, closets and doors.
  • Foundation and site — slab-on-grade or raised floor, soil, drainage and whether the lot is in a mapped flood zone.
  • The roof tie-in — matching tile or shingle, and whether part of the existing roof is redone so the two match.
  • Plumbing — a bathroom or kitchenette adds the most, and septic capacity matters on homes that are not on sewer.
  • Finishes, windows and doors — rated for the design wind pressure at your address, matched to the house or upgraded.

Room addition cost guide (2026) →

Plan it

Addition & ADU guides

Get In Touch

Plan your Baldwin Park addition or ADU

Call (407) 993-6889 or send your project details — we’ll get right back to you.

Additions & ADUs FAQ

Common questions

It depends on your city or county's zoning, lot size, and setbacks — the rules differ from one jurisdiction to the next across Seminole, Orange and Osceola counties. We check what applies to your specific lot before you spend money on design.
Most room additions run about 3–5 months from permit to finish; second stories and ADUs take longer. Engineering and permitting happen before we break ground, and we give you a schedule up front. In Baldwin Park, permit review goes through City of Orlando Permitting Services, and we build their turnaround into the schedule we give you.
Yes — additions require structural engineering and permitting, and we coordinate both, plus any HOA or architectural-review approval, as part of the project. In Baldwin Park, that review goes through City of Orlando Permitting Services.
An addition expands your existing home; an ADU is a separate living unit with its own kitchen and bath, whether detached or a garage conversion. They're permitted differently — we'll explain which fits your goal. We do this work across Baldwin Park and the wider Orange County area from our base in Oviedo.
Additions & ADUs in Baldwin Park, FL — planning ranges (updated October 2026): Room addition $40,000 – $120,000 · Second-story addition $150,000 – $300,000+ · ADU / garage conversion $50,000 – $180,000. Ranges are planning figures, not a quote — every project is priced after a site visit. Permit and inspection fees charged by City of Orlando Permitting Services are separate and itemised in your Baldwin Park estimate.
Every home addition or ADU we take on in Baldwin Park is run by Vladimir Svirsky, president of Right Image Inc, under Florida certified general contractor licence CGC1539321 — the same licence that pulls the permit with City of Orlando Permitting Services and schedules the inspections — so there is one point of accountability from the first walkthrough to the final inspection. You can verify licence CGC1539321 on the Florida Department of Business & Professional Regulation (DBPR) licence search.
Yes, inside city limits. Orlando allows one ADU per lot in all residential and MXD districts and in O-1 and O-2, subject to minimum lot size, up to 500 or 1,000 sq ft depending on the district and lot. It can be rented long-term with no owner-occupancy rule, and the city's ADU Incentive Program rebates up to $10,000 plus impact and permit fees when the ADU is rented at or below 120% of area median income for 12 of the first 24 months. Source: Orlando City Code Ch. 58, Part 3A (Secs. 58.500–58.501), per the city's ADU guide, City of Orlando (checked October 2026). We confirm the rules for your parcel before design.
Yes — Right Image Builders serves all of Baldwin Park and Orange County from our base in Oviedo. Call (407) 993-6889 or request a free estimate.
City of Orlando Permitting Services. Baldwin Park is part of the City of Orlando — permits go through the City of Orlando. We handle the permitting for your project either way.
All of it — including Village Center, New Broad Street, Enclave, Lake Baldwin — plus the surrounding Orange County area. If you're not sure whether your street is inside the city limits, tell us the address and we'll confirm which building department reviews the work.
Nearby

Home additions nearby

Additions & ADUs pages for the communities around Baldwin Park, each with the same planning ranges and its own permit office.

More in Baldwin Park

Other services we provide in Baldwin Park

Talk through your Baldwin Park addition with us

(407) 993-6889
Call (407) 993-6889 — Free Estimate