Room additions, second stories, in-law suites and ADUs in Oviedo — engineered, permitted and built from foundation to finish by one licensed team.
We typically reply the same business day.
Home additions in Oviedo, FL: Right Image Inc (Right Image Builders) is a licensed and insured Florida general contractor (CGC1539321) based in Oviedo, building room additions, second stories, in-law suites, garage conversions and ADUs across Oviedo and Seminole County — structural engineering, permitting and construction under one contract.
Additions & ADUs in Oviedo, FL — planning ranges (updated October 2026): Room addition $40,000 – $120,000 · Second-story addition $150,000 – $300,000+ · ADU / garage conversion $50,000 – $180,000. Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. Permits run through City of Oviedo Building Division. Ranges are planning figures, not a quote — every project is priced after a site visit.
Adding on is the most structural work a home can undergo — foundation, framing, roofline, and tie-ins all have to be engineered and permitted correctly. We manage the whole process, from feasibility and design through permits and final finishes.
Additions and accessory dwelling units (ADUs) are handled differently by each jurisdiction — the rules change between each city and the unincorporated parts of Seminole, Orange and Osceola counties. We build to what actually applies to your Oviedo lot.
Add a bedroom, primary suite, or great-room bump-out with a foundation and roofline that match the existing home.
Mother-in-law suites: attached suites for multigenerational living →
Build up when you can't build out — engineered for the existing structure and Florida wind loads.
Second-story additions: engineering, timeline and planning range →
Detached or attached accessory units and garage conversions for multigenerational living or a home office, built to local code.
ADU builder: rules by city, planning range and permits →
Garage conversions: permits, parking and what it takes to make a garage livable →
We coordinate the structural engineering, permitting, and any HOA/ARB review so the addition is legal and lasting.
We work throughout Oviedo — from Alafaya Woods and Kingsbridge to Twin Rivers, Live Oak Reserve, Oviedo on the Park. Oviedo is our home city — a fast-growing community between UCF and the Econlockhatchee River, and it sits in Seminole County, part of the Greater Orlando area we cover from our office here in Oviedo.
Permitting for an Oviedo home addition goes through City of Oviedo Building Division. Not every Oviedo address is inside the city limits — some are unincorporated Seminole County, and that changes which department reviews your plans. We confirm the jurisdiction for your exact address before anything gets filed.
Alongside Oviedo, we regularly take on work in nearby communities including Winter Springs, Casselberry, Longwood and Lake Mary.
Every Oviedo home addition we take on is run by the same licensed general contractor (CGC1539321) that pulls the permit — so there is one point of accountability from the first walkthrough in Alafaya Woods or Kingsbridge through final inspection with City of Oviedo Building Division.
Most Oviedo housing is 1985–2010 subdivision construction — Alafaya Woods, Kingsbridge, Twin Rivers, Live Oak Reserve — slab-on-grade block or frame-and-stucco homes, many under HOAs, with newer townhomes around Oviedo on the Park. Older homes sit near downtown and along the rural roads toward Black Hammock and Chuluota, where lots are large and many are on wells and septic. For additions and ADUs, it means confirming the zoning, setbacks and any HOA or architectural review for your specific lot before design starts.
Oviedo allows one accessory dwelling unit per lot, attached or detached, in its single-family, agricultural and downtown-neighborhood districts with a zoning permit and a building permit — no public hearing. The ADU must have its own entrance, kitchen and full bathroom, match the main house, sit no closer to the street than the house, and can't be sold separately.
Source: Oviedo Land Development Code Sec. 5.10 (amended by Ord. 1762, Feb. 2026), City of Oviedo (checked October 2026). Rules change, and HOA covenants can be stricter than the code; we confirm both for your parcel before design.
Inside the city, an addition is permitted through the City of Oviedo Building Division; nearby unincorporated addresses — Black Hammock, Chuluota and Geneva — go through the Seminole County Building Division. Our office is on Elm Street in Oviedo, so the first site visit is a short drive.
Most Oviedo housing is 1985–2010 subdivision construction — Alafaya Woods, Kingsbridge, Twin Rivers, Live Oak Reserve — slab-on-grade block or frame-and-stucco homes under HOAs, so a ground-floor room addition with a matching roofline is the common project and the HOA's architectural review comes before the permit set. Along the rural roads toward Black Hammock and Chuluota, lots are large and many homes are on wells and septic; adding a bedroom there can require the septic system's capacity to be reviewed before the permit is issued.
Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. The stages are the same for every addition we build across Greater Orlando; what changes is the size of the job and the review time at your building department.
Oviedo is our home city — a fast-growing community between UCF and the Econlockhatchee River. We cover all of Oviedo — Alafaya Woods, Kingsbridge, Twin Rivers, Live Oak Reserve, Oviedo on the Park — and the surrounding Seminole County area, with plans filed through City of Oviedo Building Division.
Serving all of Oviedo and the surrounding Seminole County area.
Permit authority: City of Oviedo Building Division
Oviedo issues its own building permits; nearby unincorporated addresses such as Black Hammock and Chuluota go through Seminole County. We pull the permits and manage the inspections as part of your project.
County: Seminole County
Finish and layout examples for additions & ADUs. Photos of completed projects are being added.


Quoted word for word from our Google Business Profile (Oct 2026). Reviewers name the work; we add nothing.
Right Image Inc. built my ADU and installed a new roof, and I’m very pleased with how everything turned out. Vladimir and his team were easy to work with, answered my questions, and paid attention to the details. Thank you for helping bring this project to life!
Thank you, Right Image Inc., for our new roof, stucco, and bathroom remodel! Our home looks refreshed, and we’re very happy with the results. Vladimir and his team were helpful throughout the project and took care of the details. We appreciate your hard work and highly recommend your services!
Excellent service at a reasonable price! They repaired a roof leak around a pipe vent, and I’m very happy with the work. I appreciate their help and would highly recommend them to anyone needing a roof repair.
Typical planning ranges for an Oviedo addition or ADU. Planning ranges only, not a quote — final pricing depends on size, foundation and site.
| Project | Typical range | Notes |
|---|---|---|
| Room addition | $40,000 – $120,000 | Size, foundation, finishes |
| Second-story addition | $150,000 – $300,000+ | Structural reinforcement, new stair, roof |
| ADU / garage conversion | $50,000 – $180,000 | Detached vs. conversion, utilities, kitchen/bath |
These are typical planning ranges — not a quote. Every project is priced after we see the space. Permit and inspection fees charged by City of Oviedo Building Division are separate and vary by scope, and we itemise them for your Oviedo estimate rather than burying them in a lump sum.
Call (407) 993-6889 or send your project details — we’ll get right back to you.
Additions & ADUs pages for the communities around Oviedo, each with the same planning ranges and its own permit office.