Room additions, second stories, in-law suites and ADUs in Altamonte Springs — engineered, permitted and built from foundation to finish by one licensed team.
We typically reply the same business day.
Home additions in Altamonte Springs, FL: Right Image Inc (Right Image Builders) is a licensed and insured Florida general contractor (CGC1539321) based in Oviedo, building room additions, second stories, in-law suites, garage conversions and ADUs across Altamonte Springs and Seminole County — structural engineering, permitting and construction under one contract.
Additions & ADUs in Altamonte Springs, FL — planning ranges (updated October 2026): Room addition $40,000 – $120,000 · Second-story addition $150,000 – $300,000+ · ADU / garage conversion $50,000 – $180,000. Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. Permits run through City of Altamonte Springs Building Division. Ranges are planning figures, not a quote — every project is priced after a site visit.
Adding on is the most structural work a home can undergo — foundation, framing, roofline, and tie-ins all have to be engineered and permitted correctly. We manage the whole process, from feasibility and design through permits and final finishes.
Additions and accessory dwelling units (ADUs) are handled differently by each jurisdiction — the rules change between each city and the unincorporated parts of Seminole, Orange and Osceola counties. We build to what actually applies to your Altamonte Springs lot.
Add a bedroom, primary suite, or great-room bump-out with a foundation and roofline that match the existing home.
Mother-in-law suites: attached suites for multigenerational living →
Build up when you can't build out — engineered for the existing structure and Florida wind loads.
Second-story additions: engineering, timeline and planning range →
Detached or attached accessory units and garage conversions for multigenerational living or a home office, built to local code.
ADU builder: rules by city, planning range and permits →
Garage conversions: permits, parking and what it takes to make a garage livable →
We coordinate the structural engineering, permitting, and any HOA/ARB review so the addition is legal and lasting.
We work throughout Altamonte Springs — from Sanlando Springs and Spring Oaks to Spring Valley, Lake Brantley, Lake Orienta. Altamonte Springs is a dense, amenity-rich Seminole County hub near I-4 and Cranes Roost, and it sits in Seminole County, part of the Greater Orlando area we cover from our base in Oviedo.
Permitting for an Altamonte Springs home addition goes through City of Altamonte Springs Building Division. Altamonte Springs runs its own building department, so plan review and inspections stay local. We deal with that office directly on your behalf.
Alongside Altamonte Springs, we regularly take on work in nearby communities including Maitland, Casselberry, Longwood and Winter Park.
Every Altamonte Springs home addition we take on is run by the same licensed general contractor (CGC1539321) that pulls the permit — so there is one point of accountability from the first walkthrough in Sanlando Springs or Spring Oaks through final inspection with City of Altamonte Springs Building Division.
Altamonte Springs is dense and largely 1970s–80s — single-family streets in Spring Oaks, Sanlando Springs and Spring Valley, plus many condominium and townhome associations around Cranes Roost and SR 436. Condo and HOA rules often decide what a remodel can change on the outside. For additions and ADUs, it means confirming the zoning, setbacks and any HOA or architectural review for your specific lot before design starts.
Altamonte Springs does not permit ADUs, granny flats or garage apartments by right anywhere in the city. A guest house without kitchen facilities is permitted in the R-1AAA, R-1AA and R-1A districts, one per home; a guest house with cooking facilities needs a conditional use approved by the Planning Board after a public hearing. The R-1 districts don't allow guest houses.
Source: Altamonte Springs LDC §3.6.2(k) and §3.6.3(c), per the city's guest-house FAQ, City of Altamonte Springs (checked October 2026). Rules change, and HOA covenants can be stricter than the code; we confirm both for your parcel before design.
Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. The stages are the same for every addition we build across Greater Orlando; what changes is the size of the job and the review time at your building department.
Altamonte Springs is a dense, amenity-rich Seminole County hub near I-4 and Cranes Roost. We cover all of Altamonte Springs — Sanlando Springs, Spring Oaks, Spring Valley, Lake Brantley, Lake Orienta — and the surrounding Seminole County area, with plans filed through City of Altamonte Springs Building Division.
Serving all of Altamonte Springs and the surrounding Seminole County area.
Permit authority: City of Altamonte Springs Building Division
Altamonte Springs issues its own building permits. We pull the permits and manage the inspections as part of your project.
County: Seminole County
Finish and layout examples for additions & ADUs. Photos of completed projects are being added.


Quoted word for word from our Google Business Profile (Oct 2026). Reviewers name the work; we add nothing.
Right Image Inc. built my ADU and installed a new roof, and I’m very pleased with how everything turned out. Vladimir and his team were easy to work with, answered my questions, and paid attention to the details. Thank you for helping bring this project to life!
Thank you, Right Image Inc., for our new roof, stucco, and bathroom remodel! Our home looks refreshed, and we’re very happy with the results. Vladimir and his team were helpful throughout the project and took care of the details. We appreciate your hard work and highly recommend your services!
Excellent service at a reasonable price! They repaired a roof leak around a pipe vent, and I’m very happy with the work. I appreciate their help and would highly recommend them to anyone needing a roof repair.
Typical planning ranges for an Altamonte Springs addition or ADU. Planning ranges only, not a quote — final pricing depends on size, foundation and site.
| Project | Typical range | Notes |
|---|---|---|
| Room addition | $40,000 – $120,000 | Size, foundation, finishes |
| Second-story addition | $150,000 – $300,000+ | Structural reinforcement, new stair, roof |
| ADU / garage conversion | $50,000 – $180,000 | Detached vs. conversion, utilities, kitchen/bath |
These are typical planning ranges — not a quote. Every project is priced after we see the space. Permit and inspection fees charged by City of Altamonte Springs Building Division are separate and vary by scope, and we itemise them for your Altamonte Springs estimate rather than burying them in a lump sum.
Call (407) 993-6889 or send your project details — we’ll get right back to you.
Additions & ADUs pages for the communities around Altamonte Springs, each with the same planning ranges and its own permit office.