Home / Planning guides / Permits by city and county
Planning guide · Permits

Who issues your building permit in Seminole, Orange and Osceola County?

City or county, the office for each place we serve, and what changes from one counter to the next. Updated October 2026.

Right Image Inc · Lic. #CGC1539321
Right Image Inc project team · CGC1539321
Updated October 2026
Based in Oviedo, FL

Free Project Estimate

We typically reply the same business day.

✔ Lic. #CGC1539321
✔ Permits & inspections handled
✔ 433+ projects completed
★ 5.0★ on Google (7 reviews)
✔ Licensed & Insured

Your permit comes from the city if the property is inside city limits and from the county if it is unincorporated, whatever the mailing address says. Across the 19 places we serve that means a different office for almost every city, plus the three county offices for unincorporated addresses. They all apply the same Florida Building Code, the same Notice of Commencement rule and the same $7,500 permit exemption, but they differ on ADU rules, flood-zone valuation and review times. The table below gives the office for each place.

At a glance

Which office issues permits for each place?

PlaceCountyPermit officeADUs
OviedoSeminoleCity of Oviedo Building DivisionYes — with a zoning permit
Winter SpringsSeminoleCity of Winter Springs Building DivisionYes — by conditional use (two public hearings)
CasselberrySeminoleCity of Casselberry Building DivisionNot currently — no ADU ordinance
LongwoodSeminoleCity of Longwood Building DivisionYes, as an accessory structure — confirm the path
Lake MarySeminoleCity of Lake Mary Building DivisionGuest house only, A-1 and R-CE
SanfordSeminoleCity of Sanford Building DivisionYes — owner, family or caretaker occupancy
Altamonte SpringsSeminoleCity of Altamonte Springs Building DivisionNot by right — guest houses in R-1AAA, R-1AA, R-1A
OrlandoOrangeCity of Orlando Permitting ServicesYes — permitted use
Winter ParkOrangeCity of Winter Park Building DivisionGuesthouse only — not a rentable ADU
MaitlandOrangeCity of Maitland Building DivisionCottage residence — limited
Baldwin ParkOrangeCity of Orlando Permitting ServicesYes — permitted use
Lake NonaOrangeCity of Orlando Permitting ServicesYes — permitted use
ApopkaOrangeCity of Apopka Building DivisionNot yet in our rules table — confirmed per address
OcoeeOrangeCity of Ocoee Building DivisionNot yet in our rules table — confirmed per address
Winter GardenOrangeCity of Winter Garden Building DivisionYes — on homesteaded lots (Ord. 26-17, 2026)
WindermereOrangeTown of Windermere / Orange CountyNot yet in our rules table — confirmed per address
KissimmeeOsceolaCity of Kissimmee Building DivisionYes — LDC Sec. 14-6-2
St. CloudOsceolaCity of St. Cloud Building DivisionYes — permitted use
CelebrationOsceolaOsceola County Building DepartmentYes — accessory living unit

Offices from our city records; ADU entries link to the sourced rules on ADU rules by city. Addresses near a city line, and many 'Orlando', 'Windermere' or 'Kissimmee' mailing addresses, are unincorporated and go through the county, so we confirm the office for every address.

City or county

How do you know whether the city or the county reviews your project?

The mailing address doesn't decide it; the city limits do. Many homes with an Orlando, Windermere, Kissimmee or Oviedo mailing address are in unincorporated parts of Orange, Osceola or Seminole County, and those permits go through the county. Inside city limits, the city's building division issues the permit.

A few places need care. Baldwin Park is part of the City of Orlando. Most of Lake Nona is inside the City of Orlando, but some nearby communities with Lake Nona or Orlando addresses are unincorporated Orange County. The Town of Windermere permits inside town limits, while many Windermere addresses are unincorporated Orange County. Celebration is an unincorporated community, so permits go through Osceola County, and its covenants and design review apply as well. Tell us the address and we confirm which building department reviews the work.

The same everywhere

Which rules are the same at every office?

  • The Florida Building Code, 8th Edition (2023), in effect statewide since December 31, 2023; local offices add their own administrative rules on top.
  • Product approval: windows, exterior doors, roofing, skylights and shutters need a Florida Product Approval or a local approval for the job.
  • Notice of Commencement: when the direct contract is greater than $5,000, the office needs a copy of the recorded notice before the first inspection; repair or replacement of an existing heating or air-conditioning system under $15,000 is excluded (F.S. 713.135).
  • The $7,500 exemption: since July 1, 2026, every local government that issues permits must exempt single-family owners from a permit for work valued under $7,500 on written request, except electrical, plumbing, structural, mechanical or gas work and property in a flood hazard area.
  • Flood rules: in a mapped flood zone, improvements costing 50% or more of the building's market value are substantial improvements under the National Flood Insurance Program (44 CFR 59.1).
What differs

Where do the offices differ?

  • ADU rules. Florida lets each city and county decide (F.S. 163.31771). The City of Orlando allows ADUs as a permitted use; Oviedo with a zoning permit; unincorporated Seminole County by right or administratively; unincorporated Orange County only on homestead property; Winter Springs by conditional use; Casselberry has no ADU ordinance yet. See ADU rules by city.
  • Flood-zone valuation. Seminole County measures the 50% threshold against the structure's assessed tax value; the City of Orlando uses its appraised value.
  • Zoning, setbacks and lot coverage, which decide how big an addition can be and where it can go.
  • Historic districts and design review, for example in parts of Orlando and Winter Park, and covenants in planned communities such as Celebration.
  • Review times and portals, which change with each office's workload; we build the current turnaround into your written schedule.
Who does the paperwork

Who pulls the permit?

Normally the licensed contractor: the permit is pulled under the contractor's licence, and the contractor schedules the inspections. A homeowner can pull a permit as an owner-builder only for their own home and must personally supervise the work, so be wary of a contractor who asks you to pull it. We file the permits for our projects under Florida certified general contractor licence CGC1539321 with the building department for your address.

Next step

What should you do first?

  1. Find your place in the table, then confirm city limits for the exact address.
  2. If you're planning an ADU, read the rule for your jurisdiction on ADU rules by city.
  3. Look up the flood zone on the FEMA Flood Map Service Center.
  4. Send us the address and the project; we confirm the office, the rules and the schedule with your written estimate.

Sources (primary sources, checked 2026-10-16): Florida Building Code · F.S. 713.135 · F.S. 553.79 · F.S. 553.842 · 44 CFR 59.1 · Seminole County flood rules · FEMA Flood Map Service Center · F.S. 163.31771. This page explains rules in general terms; it is not legal advice, and the building department for your address has the final word.

Get In Touch

Tell us your address and project

Call (407) 993-6889 or send your project details — we’ll get right back to you.

FAQ

Common questions

City limits decide, not the mailing address. Many homes with an Orlando, Windermere, Kissimmee or Oviedo mailing address are unincorporated and permit through the county. Send us the address and we confirm which building department reviews your project.
Baldwin Park is part of the City of Orlando, so the City of Orlando issues permits there. Most of Lake Nona is also inside the City of Orlando, but some nearby communities with Lake Nona or Orlando addresses are unincorporated Orange County, so the office is confirmed per address.
The Town of Windermere issues permits inside town limits. Many homes with a Windermere mailing address, including large parts of the Butler Chain area, are unincorporated Orange County, so their permits go through Orange County.
No. Celebration is an unincorporated community in Osceola County, so building permits go through Osceola County, and the community's covenants and design review also apply to exterior work.
Yes: the Florida Building Code, 8th Edition (2023), applies statewide. The offices differ in zoning, ADU rules, flood-zone valuation, historic and design review, and review times, which is why the address matters as much as the project.