Do you need a permit for a home addition in Orlando or Seminole County?

Yes, always. Which office issues it, what Florida's $7,500 exemption does and doesn't cover, the Notice of Commencement, deposit rules and flood zones. Updated October 2026.

Right Image Inc · Lic. #CGC1539321
Right Image Inc project team · CGC1539321
Updated October 2026
Based in Oviedo, FL

Free Addition Estimate

We typically reply the same business day.

✔ Lic. #CGC1539321
✔ Permits & inspections handled
✔ 433+ projects completed
★ 5.0★ on Google (7 reviews)
✔ Licensed & Insured

Yes. A home addition is structural work, so it needs a building permit with engineered drawings from the city or county that covers your address, plus electrical, plumbing and mechanical permits for the trades involved. Florida's $7,500 permit exemption, in force since July 1, 2026, excludes structural, electrical, plumbing, mechanical and gas work and any flood hazard area, so it never covers an addition. We pull the permit under licence CGC1539321 and schedule every inspection.

At a glance

Home addition permits in Greater Orlando: the short answers

QuestionAnswer
Does a home addition need a permit?Yes, every time: a building permit with sealed structural drawings, plus electrical, plumbing and mechanical permits for the trades involved.
Does the $7,500 exemption apply?No. It excludes structural, electrical, plumbing, mechanical and gas work and flood hazard areas, and an addition is all of the first and often the rest.
Which office?The city if the property is inside city limits, the county if it is unincorporated — whatever the mailing address says.
Which code?The Florida Building Code, 8th Edition (2023); wind design is set per address, and none of our three counties is in the High-Velocity Hurricane Zone.
Notice of Commencement?Required when the direct contract is greater than $5,000; it must be recorded and posted on site before the first inspection.
Deposit rules?A contractor who takes more than 10% up front must apply for the permit within 30 days and start work within 90 days after it is issued.
Flood zone?In a mapped special flood hazard area, work costing 50% or more of the building's value triggers the new-construction flood standards.
HOA or architectural review?Separate from the permit and often first; the permit office does not enforce HOA covenants.
Who pulls it?We do, under licence CGC1539321, which Florida law requires on every bid, contract and advertisement.
The rule

Why does a home addition always need a permit?

Since July 1, 2026, Florida law (HB 803, now in F.S. 553.79) requires local governments to exempt single-family homeowners and their contractors from a building permit for work valued under $7,500, after a written request with the contract. The same law lists what the exemption never covers: any electrical, plumbing, structural, mechanical or gas work, and any property in a flood hazard area. A project may not be split into pieces to get under the threshold.

An addition is structural by definition — a new foundation, new walls, a new roof tied into the old one — and almost always brings wiring, ductwork and often plumbing with it. So the exemption does not apply, and the full permit path does: a building permit reviewed against the Florida Building Code, 8th Edition (2023), with the trade permits issued alongside it. The 9th Edition is in development and not yet in effect; we confirm the edition in force when the permit is submitted.

The practical consequence is that the drawings come first. The permit office reviews a site plan showing the setbacks, floor plans and elevations, sealed structural engineering for the foundation, the roof tie-in and the wind design for your address, and energy calculations for the new conditioned space. Review comments, if any, are answered before the permit is issued, and inspections follow each stage of the build until the permit is closed.

City or county

Which office issues the permit for a home addition?

The city issues the permit when the property is inside city limits; the county does when it is unincorporated. A mailing address does not settle it — many homes with an Orlando address are in unincorporated Orange County, and addresses on the rural edge of Oviedo are in unincorporated Seminole County. We check the parcel before anything is filed. The table gives the office for each place we build in; the city pages carry the same information with the planning ranges.

PlaceCountyPermit office for an addition
Home additions in OrlandoOrangeCity of Orlando Permitting Services inside city limits; Orange County Division of Building Safety for unincorporated addresses such as Conway, Dr. Phillips and Azalea Park
Home additions in Baldwin Park and Lake NonaOrangeCity of Orlando Permitting Services (most of Lake Nona; some nearby communities are unincorporated Orange County)
Home additions in OviedoSeminoleCity of Oviedo Building Division; Black Hammock, Chuluota and Geneva go through the Seminole County Building Division
Home additions in Winter SpringsSeminoleCity of Winter Springs Building Division
Home additions in CasselberrySeminoleCity of Casselberry Building Division
Home additions in LongwoodSeminoleCity of Longwood Building Division; the historic district adds design review
Home additions in Lake MarySeminoleCity of Lake Mary Building Division
Home additions in SanfordSeminoleCity of Sanford Building Division
Home additions in Altamonte SpringsSeminoleCity of Altamonte Springs Building and Fire Safety
Home additions in Winter Park and MaitlandOrangeCity of Winter Park Building & Permitting Services; City of Maitland Building Permits
Home additions in Apopka, Ocoee, Winter Garden and WindermereOrangeEach city's building division inside its limits; Orange County Division of Building Safety for unincorporated addresses
Home additions in Kissimmee and St. CloudOsceolaCity of Kissimmee Development Services; City of St. Cloud Building Department
Home additions in CelebrationOsceolaOsceola County Building Office; Celebration's design guidelines and architectural review come first

Office names from each jurisdiction's building department pages; the full list with ADU rules is in who issues your permit.

The permit set

What does the building department review for an addition?

Design wind speed is not one number for the region: it is set per address under the code, and windows and exterior doors must carry Florida Product Approval for the pressures that result. None of Seminole, Orange or Osceola County is in the High-Velocity Hurricane Zone, which covers Broward and Miami-Dade only, so a Miami-Dade product approval is not required here by statute.

  • Site plan and survey — the footprint against the zoning setbacks and lot-coverage limit; a boundary survey where the setbacks are tight.
  • Floor plans and elevations — the new space and how its roofline and exterior finish meet the existing house.
  • Structural engineering — sealed drawings for the footing and slab or raised floor, the wall and roof framing, the tie-in to the existing structure and the wind design for your address under the Florida Building Code.
  • Energy calculations — the insulation, glazing and heating and cooling for the new conditioned space.
  • Trade permits — electrical, plumbing and mechanical, issued with the building permit and inspected separately.
  • Flood information — the flood zone for the parcel and, where it applies, the value of the work against the building's value.
Notice of Commencement

Do you need a Notice of Commencement for a home addition?

Almost always. Under F.S. 713.135, the permit office must require a copy of the Notice of Commencement before the first inspection when the direct contract is greater than $5,000, and the notice has to be recorded and posted on the site before that inspection. Every addition we build is above that threshold. The owner signs the notice; we prepare it with the permit paperwork so it is recorded and posted before the first inspection is called, and we close it out with the permit.

Two related contract rules apply at the same time. A residential contract where labor and materials exceed $2,500 must carry the Florida Homeowners' Construction Recovery Fund notice (F.S. 489.1425) and, for work on a one- to four-unit home, the construction lien law disclosure (F.S. 713.015). Our written contracts include both.

Deposits

How much can a contractor take before the permit is issued?

Florida does not cap the deposit, but it does tie a large one to the permit. Under F.S. 489.126, a contractor who receives an initial payment of more than 10% of the contract price for residential work must apply for the necessary permits within 30 days and start the work within 90 days after the permits are issued, unless there is just cause or a written agreement to a longer period. If a contractor asks for a large deposit and then goes quiet, that statute is the first thing to check.

The licence number must appear on every offer, proposal, bid, contract and advertisement (F.S. 489.119). Ours is CGC1539321, and you can verify it on the DBPR licence search before you sign.

Flood zones

What changes if the house is in a flood zone?

Look the address up on the FEMA Flood Map Service Center first. In a mapped special flood hazard area, work costing 50% or more of the building's market value before the work is a substantial improvement (44 CFR 59.1), and the existing building must then meet the flood standards for new construction — which typically means raising the living area. Florida law (F.S. 163.31795) bars local governments from adding projects together over several years to reach the threshold, so the test is per project.

The valuation method is local. Seminole County applies the test to an addition or other improvement that costs 50% or more of the building's market value; the City of Orlando applies its substantial improvement and damage rules to existing buildings in the Special Flood Hazard Area, which can require the finished floor to be raised. Because the threshold is a share of the building's value, a large addition on a lower-value house crosses it sooner than a modest one on a newer house. We check the zone and the local method before design, and the exemption above never applies in a flood hazard area in any case.

After the permit

What else is reviewed, and what changes after the addition?

HOA and architectural review is separate from the permit. In Baldwin Park, Lake Nona, Celebration and most planned communities in Seminole County, the association's review board approves the elevations, roofline and materials, and that approval usually has to be in hand before the building department will issue the permit. The drawings for the association come from the same design set.

Property taxes follow the new value. Under Florida's Save Our Homes rules (F.S. 193.155), changes, additions and improvements are assessed at just value when they are added, while the yearly increase on the existing homestead stays capped. The county property appraiser sets the figure. If the addition is an accessory dwelling unit inside the City of Orlando, the city's ADU Incentive Program rebates up to $10,000 toward construction plus impact and permit fees after the certificate of occupancy, when the unit is rented at or below 120% of area median income for 12 of the first 24 months.

The sequence

How do we get a home addition permitted and built?

  1. Site visit: we measure, check the structure and utilities, and confirm the parcel's jurisdiction, zoning setbacks, flood zone and any HOA review.
  2. Design and a written, itemised estimate, with the permit and engineering fees shown separately.
  3. Structural engineering and energy calculations for the permit set; HOA or architectural review submitted where it applies.
  4. Permit application to the city or county for your address; review comments answered.
  5. Contract signed, Notice of Commencement recorded and posted, permit issued — then construction starts within the statutory window.
  6. Inspections at each stage, the permit closed, and a final walkthrough. about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer is the typical span from permit to finish.
Google reviews

5.0★ on Google · 7 reviews

Quoted word for word from our Google Business Profile (Oct 2026). Reviewers name the work; we add nothing.

★★★★★
Right Image Inc. built my ADU and installed a new roof, and I’m very pleased with how everything turned out. Vladimir and his team were easy to work with, answered my questions, and paid attention to the details. Thank you for helping bring this project to life!
Antonio R. — Google review, Oct 2026 · ADU & new roof
★★★★★

Thank you, Right Image Inc., for our new roof, stucco, and bathroom remodel! Our home looks refreshed, and we’re very happy with the results. Vladimir and his team were helpful throughout the project and took care of the details. We appreciate your hard work and highly recommend your services!

Elcira S. · Google, Oct 2026 · new roof, stucco & bathroom remodel
★★★★★

Excellent service at a reasonable price! They repaired a roof leak around a pipe vent, and I’m very happy with the work. I appreciate their help and would highly recommend them to anyone needing a roof repair.

Victor · Google, Oct 2026 · roof leak repair

Sources (primary sources, checked 2026-10-16): F.S. 553.79 · Florida Building Code · F.S. 713.135 · F.S. 489.126 · F.S. 489.119 · F.S. 489.1425 · F.S. 713.015 · 44 CFR 59.1 · Seminole County flood rules · FEMA Flood Map Service Center · F.S. 193.155 · ADU Incentive Program · DBPR. This page explains rules in general terms; it is not legal advice, and the building department for your address has the final word.

Get In Touch

Tell us your address and what you want to add

Call (407) 993-6889 or send your project details — we’ll get right back to you.

Home addition permit FAQ

Common questions

No. The exemption that took effect July 1, 2026 excludes any structural, electrical, plumbing, mechanical or gas work and any property in a flood hazard area. A room addition is structural work, so it needs the full building permit regardless of its value, and a project may not be split into pieces to get under the threshold.
City of Orlando Permitting Services if the property is inside the city limits, including Baldwin Park and most of Lake Nona. Homes with an Orlando mailing address in Conway, Dr. Phillips or Azalea Park are usually in unincorporated Orange County, where the Orange County Division of Building Safety reviews the plans. We confirm the jurisdiction for your parcel before filing.
The City of Oviedo Building Division inside the city limits. Addresses in Black Hammock, Chuluota and Geneva are unincorporated Seminole County and go through the Seminole County Building Division. Either way we prepare and file the permit set and schedule the inspections.
Yes when the direct contract is greater than $5,000, which covers every addition we build. The permit office must have a copy before the first inspection, and the notice has to be recorded and posted on the site by then. You sign it; we prepare it with the permit paperwork.
Yes, but a deposit of more than 10% of the contract price obliges the contractor to apply for the permits within 30 days and start work within 90 days after they are issued, unless there is just cause or a written agreement to a longer period. Check that the licence number is on the contract and verify it on the DBPR licence search before paying anything.
In a mapped special flood hazard area, if the addition and any other work cost 50% or more of the building's market value, the existing house has to be brought up to the flood standards for new construction, which typically means raising the living area. Seminole County and the City of Orlando apply the test with their own valuation methods, and Florida bars adding projects together across years to reach it. We check the flood zone before design.