Room additions, second stories, in-law suites and ADUs in St. Cloud — engineered, permitted and built from foundation to finish by one licensed team.
We typically reply the same business day.
Home additions in St. Cloud, FL: Right Image Inc (Right Image Builders) is a licensed and insured Florida general contractor (CGC1539321) based in Oviedo, building room additions, second stories, in-law suites, garage conversions and ADUs across St. Cloud and Osceola County — structural engineering, permitting and construction under one contract.
Additions & ADUs in St. Cloud, FL — planning ranges (updated October 2026): Room addition $40,000 – $120,000 · Second-story addition $150,000 – $300,000+ · ADU / garage conversion $50,000 – $180,000. Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. Permits run through City of St. Cloud Building Division. Ranges are planning figures, not a quote — every project is priced after a site visit.
Adding on is the most structural work a home can undergo — foundation, framing, roofline, and tie-ins all have to be engineered and permitted correctly. We manage the whole process, from feasibility and design through permits and final finishes.
Additions and accessory dwelling units (ADUs) are handled differently by each jurisdiction — the rules change between each city and the unincorporated parts of Seminole, Orange and Osceola counties. We build to what actually applies to your St. Cloud lot.
Add a bedroom, primary suite, or great-room bump-out with a foundation and roofline that match the existing home.
Mother-in-law suites: attached suites for multigenerational living →
Build up when you can't build out — engineered for the existing structure and Florida wind loads.
Second-story additions: engineering, timeline and planning range →
Detached or attached accessory units and garage conversions for multigenerational living or a home office, built to local code.
ADU builder: rules by city, planning range and permits →
Garage conversions: permits, parking and what it takes to make a garage livable →
We coordinate the structural engineering, permitting, and any HOA/ARB review so the addition is legal and lasting.
We work throughout St. Cloud — from Anthem Park and Stevens Plantation to Lakeshore, Canoe Creek, Narcoossee area. St. Cloud is a growing Osceola County city on East Lake Tohopekaliga with newer subdivisions, and it sits in Osceola County, part of the Greater Orlando area we cover from our base in Oviedo.
Permitting for a St. Cloud home addition goes through City of St. Cloud Building Division. St. Cloud runs its own building department, so plan review and inspections stay local. We deal with that office directly on your behalf.
Alongside St. Cloud, we regularly take on work in nearby communities including Kissimmee, Lake Nona, Celebration and Orlando.
Every St. Cloud home addition we take on is run by the same licensed general contractor (CGC1539321) that pulls the permit — so there is one point of accountability from the first walkthrough in Anthem Park or Stevens Plantation through final inspection with City of St. Cloud Building Division.
St. Cloud combines a historic downtown and lakefront of 1900s–1950s homes with 2000s subdivisions like Anthem Park and Stevens Plantation and new construction along the Narcoossee corridor, where many addresses permit through Osceola County rather than the city. For additions and ADUs, it means confirming the zoning, setbacks and any HOA or architectural review for your specific lot before design starts.
St. Cloud lists accessory dwelling units as a permitted use in its single-family districts (R-E, R-1, R-1A and R-1B) under LDC Sec. 3.14.30, and ADUs are a standard building-permit type with the city. The size, occupancy and parking standards sit in Sec. 3.14.30, which the city was revising in 2026 (Ordinance 2026-17), so we confirm the current standards for your lot before design.
Source: St. Cloud Land Development Code Sec. 3.14.30, City of St. Cloud (checked October 2026). Rules change, and HOA covenants can be stricter than the code; we confirm both for your parcel before design.
Typical time: about 3–5 months from permit to finish for a room addition; second stories and ADUs take longer. The stages are the same for every addition we build across Greater Orlando; what changes is the size of the job and the review time at your building department.
St. Cloud is a growing Osceola County city on East Lake Tohopekaliga with newer subdivisions. We cover all of St. Cloud — Anthem Park, Stevens Plantation, Lakeshore, Canoe Creek, Narcoossee area — and the surrounding Osceola County area, with plans filed through City of St. Cloud Building Division.
Serving all of St. Cloud and the surrounding Osceola County area.
Permit authority: City of St. Cloud Building Division
City of St. Cloud permits inside city limits; outlying addresses go through Osceola County. We pull the permits and manage the inspections as part of your project.
County: Osceola County
Finish and layout examples for additions & ADUs. Photos of completed projects are being added.


Quoted word for word from our Google Business Profile (Oct 2026). Reviewers name the work; we add nothing.
Right Image Inc. built my ADU and installed a new roof, and I’m very pleased with how everything turned out. Vladimir and his team were easy to work with, answered my questions, and paid attention to the details. Thank you for helping bring this project to life!
Thank you, Right Image Inc., for our new roof, stucco, and bathroom remodel! Our home looks refreshed, and we’re very happy with the results. Vladimir and his team were helpful throughout the project and took care of the details. We appreciate your hard work and highly recommend your services!
Excellent service at a reasonable price! They repaired a roof leak around a pipe vent, and I’m very happy with the work. I appreciate their help and would highly recommend them to anyone needing a roof repair.
Typical planning ranges for a St. Cloud addition or ADU. Planning ranges only, not a quote — final pricing depends on size, foundation and site.
| Project | Typical range | Notes |
|---|---|---|
| Room addition | $40,000 – $120,000 | Size, foundation, finishes |
| Second-story addition | $150,000 – $300,000+ | Structural reinforcement, new stair, roof |
| ADU / garage conversion | $50,000 – $180,000 | Detached vs. conversion, utilities, kitchen/bath |
These are typical planning ranges — not a quote. Every project is priced after we see the space. Permit and inspection fees charged by City of St. Cloud Building Division are separate and vary by scope, and we itemise them for your St. Cloud estimate rather than burying them in a lump sum.
Call (407) 993-6889 or send your project details — we’ll get right back to you.
Additions & ADUs pages for the communities around St. Cloud, each with the same planning ranges and its own permit office.