How to hire a kitchen remodeling contractor in Orlando and Seminole County

The checks that separate a licensed kitchen contractor from a cabinet installer with a truck: licence, contract, deposit, permits and the questions to ask before you sign. Updated October 2026.

Right Image Inc · Lic. #CGC1539321
Right Image Inc project team · CGC1539321
Updated October 2026
Based in Oviedo, FL

Free Kitchen Estimate

We typically reply the same business day.

✔ Lic. #CGC1539321
✔ Permits & inspections handled
✔ 433+ projects completed
★ 5.0★ on Google (7 reviews)
✔ Licensed & Insured

Verify the licence on the Florida DBPR search before anything else, then judge the paperwork: a written, itemised estimate with permit fees shown separately; a contract that carries the two notices Florida requires over $2,500; a deposit you understand against the 10% permit rule; and a contractor who pulls the permit in its own name, because the $7,500 exemption excludes the electrical and plumbing work almost every kitchen involves. A showroom can sell you cabinets; only a licensed contractor can open the wall, move the slab plumbing and close the permit.

At a glance

The six checks before you sign a kitchen remodeling contract

CheckWhat to look forWhere it comes from
LicenceA current Florida contractor licence under the company's name on the DBPR search; the number printed on the proposal and the contract.F.S. 489.119 requires the number on every bid, contract and advertisement.
EstimateWritten and itemised by trade, permit and engineering fees shown separately, allowances stated for anything not yet chosen.Our own standard; see what the estimate includes.
ContractScope, price, payment schedule, timeline, change-order terms, and the Recovery Fund notice and lien-law disclosure when the job is over $2,500.F.S. 489.1425 and 713.015.
DepositA deposit over 10% obliges the contractor to apply for the permit within 30 days and start within 90 days of issue.F.S. 489.126.
PermitThe contractor pulls it in its own name; the $7,500 exemption never covers electrical, plumbing, structural, mechanical or gas work.F.S. 553.79 (HB 803, 2026).
Notice of CommencementRecorded and posted before the first inspection when the contract is over $5,000.F.S. 713.135.
Step one

How do you check a kitchen contractor's licence in Florida?

Go to the Florida Department of Business and Professional Regulation licence search at myfloridalicense.com and search the company name or the licence number the contractor gave you. Read three things: the licence type, the status (it should say current and active) and the expiry date. Florida law requires the number on every offer of services, proposal, bid, contract and advertisement, so a proposal without one is a problem before you have read the price.

Ours is CGC1539321 — a certified general contractor licence held by Right Image Inc, the Florida corporation behind Right Image Builders. It is on every page of this site and every estimate we send. A kitchen remodel that opens a wall, moves plumbing or adds circuits is contractor work under Florida law; the owner-builder exemption exists for owners who personally supervise and sign the permit for their own home, which is a different job from hiring someone.

The paperwork

What should a kitchen remodel estimate and contract include?

Our planning ranges, updated October 2026: cabinet and counter refresh $15,000 – $30,000; full kitchen remodel $30,000 – $70,000; layout change or wall removal $60,000 – $100,000+. A written estimate from any contractor should let you see where your kitchen lands inside a range like that and why; the kitchen remodel cost guide explains what moves the number.

  • An itemised scope — demolition, framing or beam work, plumbing, electrical, drywall, flooring, cabinets, counters, tile, fixtures, appliances and painting, each priced on its own line.
  • Permit, engineering and inspection fees shown separately, never buried in a lump sum.
  • Allowances stated for anything not yet selected, so a cabinet or counter upgrade is a visible change rather than a surprise.
  • A schedule that includes the permit review time for your address and the cabinet lead time.
  • Change-order terms — written and priced before the work changes.
  • The two Florida notices when labor and materials exceed $2,500: the Florida Homeowners' Construction Recovery Fund notice and, for work on a one- to four-unit home, the construction lien law disclosure.
Money

How much deposit is normal, and what does Florida law say?

Florida does not cap the deposit, but it ties a large one to the permit. Under F.S. 489.126, a contractor who takes an initial payment of more than 10% of the contract price for residential work must apply for the necessary permits within 30 days and start the work within 90 days after the permits are issued, unless there is just cause or a written agreement to a longer period. For a kitchen, a reasonable schedule follows the work: a deposit when the contract is signed, a payment when cabinets are ordered (they are the long-lead item), progress payments at rough-in and at cabinet install, and the balance after the final inspection and walkthrough.

Be wary of a cash price offered to skip the permit, of a deposit that covers most of the job before anything is ordered, and of a contractor who wants you to pull the permit as an owner-builder — that makes you responsible for the work and the inspections.

Permits

Does a kitchen remodel need a permit in Orlando or Seminole County, and who pulls it?

Almost always. Since July 1, 2026, Florida law (HB 803, F.S. 553.79) lets a single-family owner request an exemption from a building permit for work valued under $7,500, but the exemption excludes any electrical, plumbing, structural, mechanical or gas work and any property in a flood hazard area. New doors and hardware on existing cabinets can qualify; a kitchen that moves a sink, adds a circuit for a range, opens a wall or relocates a gas line does not. The permit comes from the city when the address is inside city limits (City of Orlando Permitting Services, the City of Oviedo Building Division, and the building divisions of Winter Park, Lake Mary, Longwood and the other cities we serve) and from the county when it is unincorporated; who issues your permit lists every office.

The contractor pulls the permit under its own licence and schedules the inspections — rough plumbing and electrical before the walls close, framing where a wall came out, and the final. When the contract is greater than $5,000 the permit office must also have a copy of the Notice of Commencement before the first inspection, recorded and posted on the site; we prepare it with the permit paperwork. A permit that is never closed shows up at resale, so ask how and when the contractor closes it.

Who does what

General contractor, cabinet showroom or handyman: which one is your kitchen?

The difference shows the moment the layout changes. A refresh in the same footprint can be bought from a showroom with an installer; a full remodel with new wiring and plumbing, and any layout change, is general-contractor work with a permit behind it. We work from your showroom's cabinets as readily as from our own suppliers; what we add is the structure, the mechanical work, the permit and one accountable schedule.

Cabinet showroomHandymanLicensed general contractor
Cabinets and countersYes — its core productInstall onlyYes, supplied or from your showroom
Opening a load-bearing wallNoNoYes — engineered beam, structural permit
Moving plumbing or gas in a slabNoNoYes — permitted and inspected
Electrical circuits and lightingUsually referred outNot permitted workYes — on the permit
Pulls the permitRarelyNoYes, in its own name
One contract and one scheduleCabinets onlyTask by taskYes
At the first meeting

What should you ask a kitchen contractor before you sign?

  • What is your licence number, and is the licence held by the company on the contract?
  • Who is on site each day, and who do I call?
  • Which permits does this scope need, and who pulls and closes them?
  • What is included in the price, what is an allowance, and what is excluded?
  • How are change orders priced and approved?
  • What is the schedule, what sets the start date, and what happens if cabinets are late?
  • How is the house protected from dust, and will I have a working sink and a place to cook?
  • Can I see the certificates of insurance and the two Florida contract notices now?
Walk away

Which signs should make you walk away?

  • A proposal with no licence number, or a number that belongs to a different company or person.
  • A licence that shows as anything other than current and active on the DBPR search.
  • A price that drops if you pay cash or agree to skip the permit.
  • A deposit that covers most of the job before cabinets are ordered, with no permit application in sight.
  • A one-line scope — "kitchen remodel" — with no allowances and no schedule.
  • A suggestion that you pull the permit yourself as an owner-builder.
How we work

How does Right Image Inc run a kitchen remodel?

  1. Site visit: we measure, look at the slab plumbing, the electrical panel and any wall you want to open, and talk through how the kitchen is used.
  2. Selections first — cabinets, counters, appliances and lighting — because they set both the price and the start date.
  3. A written, itemised estimate with permit and engineering fees shown separately and allowances stated.
  4. Permit filed with the building department for your address once the scope touches wiring, plumbing, gas or structure; Notice of Commencement recorded where the contract requires it.
  5. Demolition, rough-in and inspections, then drywall and floor, cabinets, counter template and install, backsplash, fixtures and appliances — about 6–10 weeks for a full remodel once permits are issued and materials are in.
  6. Final inspection, permit closed, walkthrough and paperwork handed over.
Google reviews

5.0★ on Google · 7 reviews

Quoted word for word from our Google Business Profile (Oct 2026). Reviewers name the work; we add nothing.

★★★★★
Thank you, Right Image Inc., for our new roof, stucco, and bathroom remodel! Our home looks refreshed, and we’re very happy with the results. Vladimir and his team were helpful throughout the project and took care of the details. We appreciate your hard work and highly recommend your services!
Elcira S. — Google review, Oct 2026 · new roof, stucco & bathroom remodel
★★★★★

Right Image Inc. built my ADU and installed a new roof, and I’m very pleased with how everything turned out. Vladimir and his team were easy to work with, answered my questions, and paid attention to the details. Thank you for helping bring this project to life!

Antonio R. · Google, Oct 2026 · ADU & new roof
★★★★★

Excellent service at a reasonable price! They repaired a roof leak around a pipe vent, and I’m very happy with the work. I appreciate their help and would highly recommend them to anyone needing a roof repair.

Victor · Google, Oct 2026 · roof leak repair

Sources (primary sources, checked 2026-10-16): DBPR · F.S. 489.119 · F.S. 489.1425 · F.S. 713.015 · F.S. 489.126 · F.S. 553.79 · F.S. 713.135 · F.S. 489.103. This page explains rules in general terms; it is not legal advice, and the building department for your address has the final word.

Get In Touch

Get a written, itemised kitchen estimate

Call (407) 993-6889 or send your project details — we’ll get right back to you.

Hiring a kitchen contractor FAQ

Common questions

Search the company name or licence number on the DBPR licence search at myfloridalicense.com and confirm the licence type, that the status is current and active, and the expiry date. Then check that the same number is printed on the proposal and the contract, which Florida law requires on every bid and advertisement.
Yes, and Florida does not cap it, but a deposit over 10% of the contract price obliges the contractor to apply for the permit within 30 days and start within 90 days after it is issued. A schedule that pays for cabinets when they are ordered and the balance after the final inspection keeps the money in step with the work.
Usually not for the cabinets and counters alone, and since July 1, 2026 a single-family owner can request an exemption for work valued under $7,500 — but the exemption excludes any electrical, plumbing, structural, mechanical or gas work. The moment the sink moves, a circuit is added or a wall comes out, the job is permitted.
An itemised scope by trade, permit and engineering fees shown separately, stated allowances for anything not yet chosen, a schedule that includes the permit review and cabinet lead time, change-order terms, and the contractor's licence number. A single lump sum tells you nothing about what happens when a selection changes.
Two or three written, itemised bids on the same scope and selections. Bids on different scopes cannot be compared, so give each contractor the same drawings or list. Judge the itemisation, the schedule and the permit plan as much as the total.
The licensed contractor, in its own name, with the building department for your address — the city inside city limits, the county elsewhere. A contractor who asks you to pull the permit as an owner-builder is shifting responsibility for the work and the inspections to you.