Refresh, full remodel or layout change: which kitchen remodel do you need?

The three kitchen tiers we price in Greater Orlando, what each changes, what it costs and when each one makes sense. Updated October 2026.

Right Image Inc · Lic. #CGC1539321
Right Image Inc project team · CGC1539321
Updated October 2026
Based in Oviedo, FL

Free Kitchen Remodel Estimate

We typically reply the same business day.

✔ Lic. #CGC1539321
✔ Permits & inspections handled
✔ 433+ projects completed
★ 5.0★ on Google (7 reviews)
✔ Licensed & Insured

Refresh the kitchen when the layout works and the cabinet boxes are sound: new or refaced cabinets, counters and backsplash, $15,000 – $30,000. Choose a full remodel when the cabinets, counters, flooring, lighting and appliances all need replacing in the same footprint, $30,000 – $70,000. Pay for a layout change only when a wall, the sink or the range is the problem: $60,000 – $100,000+.

At a glance

How do the three kitchen tiers compare?

TierWhat changesPlanning rangeTime on sitePermit
Cabinet & counter refreshRefaced or stock cabinets, quartz or granite counters, backsplash$15,000 – $30,000Quicker than a full remodelOften needed once wiring or plumbing is touched; purely cosmetic work under $7,500 can be exempt
Full kitchen remodelNew cabinetry, counters, flooring, lighting and appliances in the same footprint$30,000 – $70,000about 6–10 weeks for a full remodel once permits are issued and materials are inYes: new lighting and appliance circuits and plumbing reconnections
Layout change / wall removalA structural beam, relocated plumbing and electrical, reframing$60,000 – $100,000+Longer than a full remodelYes, with structural review

Planning ranges (updated October 2026), not quotes; your written estimate itemises the scope. More on the kitchen remodeling page.

Tier 1

When is a refresh enough?

A refresh keeps the kitchen where it is and replaces what you see and touch: refaced or new stock cabinets, quartz or granite counters, a new backsplash, often new hardware and lighting fixtures. It suits a kitchen whose layout works and whose cabinet boxes are sound, and it is the quickest of the three.

Our planning range is $15,000 – $30,000. Most of the variation comes from whether the cabinets are refaced or replaced, the counter material and the size of the kitchen.

Tier 2

When do you need a full remodel?

A full remodel replaces the cabinetry, counters, flooring, lighting and appliances but keeps the sink, range and walls roughly where they are. Choose it when everything is tired at once, or when new appliances need new circuits and the old cabinets won't take them.

Our planning range is $30,000 – $70,000, and the typical time is about 6–10 weeks for a full remodel once permits are issued and materials are in. Ordering lead times for cabinets and appliances often decide the start date, so selections come early.

Tier 3

When is a layout change worth it?

Change the layout when the problem is the shape of the room: a wall between the kitchen and the living area, a sink that faces a wall, a range with no counter beside it, or no room for an island. Removing a load-bearing wall needs a structural beam sized by an engineer; moving the sink or range moves plumbing, gas or electrical lines.

Our planning range is $60,000 – $100,000+. Structural and plumbing work add time to the schedule and require permits and inspections.

Budget check

What does $30,000, $50,000 or $70,000 buy?

  • About $30,000 is where our refresh range ends and the full-remodel range begins: a strong refresh, or a modest full remodel in a smaller kitchen.
  • About $50,000 sits inside the full-remodel range: new cabinetry, counters, flooring, lighting and appliances in the same footprint.
  • About $70,000 is the top of the full-remodel range and overlaps the start of a layout change ($60,000 – $100,000+), where a wall comes out or plumbing moves.
Permits

Which kitchen work needs a permit?

Work that touches wiring, plumbing, gas lines or walls goes through your city or county building department. Since July 1, 2026, a single-family owner can ask for an exemption for work valued under $7,500, but not for any electrical, plumbing, structural, mechanical or gas work, and not in a flood hazard area, so it covers only a small, cosmetic job. When the contract is over $5,000, the permit office also needs a copy of the recorded Notice of Commencement before the first inspection.

Cost drivers

What drives the cost of a kitchen remodel?

  • Cabinets: refacing costs less than replacing; stock lines cost less than semi-custom or custom.
  • Counters: the material and the amount of counter, plus edge details and cut-outs.
  • Appliances: a new range, hood or wall oven can need new circuits or gas work.
  • Layout: moving the sink, range or a wall adds plumbing, electrical and structural work.
  • Flooring: whether the new floor runs under the cabinets or into adjoining rooms.
  • Lighting and electrical: recessed and under-cabinet lighting and new outlets to code.
  • The house itself: older wiring, plumbing or subfloor found during demolition.
The work

What happens during a full kitchen remodel?

  1. Design and selections: layout, cabinets, counters, appliances and lighting chosen and ordered.
  2. Permit: filed once the scope touches wiring, plumbing or gas.
  3. Demolition and protection of the rest of the house.
  4. Rough-in: electrical, plumbing and any gas or ventilation changes, then inspections.
  5. Drywall and flooring, then cabinets.
  6. Counter template and installation, backsplash, fixtures and appliances.
  7. Final inspection and walkthrough.
How to decide

How should you decide?

  1. List what bothers you: finishes, storage, appliances, or the layout itself.
  2. If the layout works, compare a refresh and a full remodel; if it doesn't, price the layout change first.
  3. Pick appliances and cabinets early; they drive both the price and the start date.
  4. Book a site visit for a written, itemised estimate.

Sources (primary sources, checked 2026-10-16): F.S. 553.79 · F.S. 713.135. This page explains rules in general terms; it is not legal advice, and the building department for your address has the final word.

Get In Touch

Get a written estimate for your kitchen

Call (407) 993-6889 or send your project details — we’ll get right back to you.

FAQ

Common questions

For a full remodel in the same footprint, usually yes: $50,000 sits inside our full-remodel planning range of $30,000 – $70,000. If a wall comes out or the sink and range move, plan on the layout-change tier, $60,000 – $100,000+.
A refresh: refacing or replacing cabinets, new counters and a backsplash, keeping the layout and most of the plumbing and wiring as they are. Our planning range is $15,000 – $30,000.
Usually, once an engineer confirms whether it is load-bearing and sizes a beam if it is. Wiring, plumbing or ductwork inside the wall has to be rerouted. It is a permitted job and falls in the layout-change tier.
For a full remodel, plan on about 6–10 weeks for a full remodel once permits are issued and materials are in; a refresh is quicker and a layout change takes longer. Most homeowners stay in the house during the work; the sequence is planned with you so the rest of the home stays usable.
Yes when it touches wiring, plumbing, gas lines or walls. Florida's under-$7,500 exemption excludes electrical, plumbing, structural, mechanical and gas work and flood hazard areas, so it covers only small cosmetic jobs, after a written request.