Walk-in shower conversion or full remodel: which does your bathroom need?

What a tub-to-shower conversion changes, what a full remodel adds, what each costs and how long it takes in Greater Orlando. Updated October 2026.

Right Image Inc · Lic. #CGC1539321
Right Image Inc project team · CGC1539321
Updated October 2026
Based in Oviedo, FL

Free Bathroom Remodel Estimate

We typically reply the same business day.

✔ Lic. #CGC1539321
✔ Permits & inspections handled
✔ 433+ projects completed
★ 5.0★ on Google (7 reviews)
✔ Licensed & Insured

Convert the tub to a walk-in shower when the rest of the bathroom works and the drain can stay roughly where it is: the tub comes out, the shower is waterproofed and sloped, and glass goes in, $12,000 – $25,000. Choose a full remodel when the vanity, tile, lighting and layout all need replacing or the plumbing has to move: $10,000 – $20,000 for a hall bath, $20,000 – $45,000 for a primary bath.

At a glance

How do the options compare?

Walk-in shower conversionHall or guest bath refreshPrimary bath remodel
What changesTub removal, waterproofing, floor slope to the drain, glassNew tile, vanity, fixtures and lightingWalk-in shower, double vanity, tile and glass, often a new layout
Planning range$12,000 – $25,000$10,000 – $20,000$20,000 – $45,000
Time on siteLess than a full remodel when the drain stays putabout 3–5 weeks on site once permits and materials are readyabout 3–5 weeks on site once permits and materials are ready; longer when plumbing moves
PermitYes: plumbing workYes when plumbing or electrical is touchedYes
SuitsA dated tub in an otherwise good bathroom; easier accessA tired hall bath with a workable layoutA primary suite that needs a new layout or a larger shower

Planning ranges (updated October 2026), not quotes. See the bathroom remodeling page.

Option 1

When is a walk-in shower conversion enough?

A conversion replaces the tub with a shower in roughly the same footprint. The tub and the surrounding tile come out, the floor is built up and sloped to the drain, the walls and floor are waterproofed, and new tile, a valve and trim and glass go in. Done properly, the old tile is removed and a waterproofed substrate is built rather than tiling over what is there.

It suits a bathroom where the vanity, toilet and floor are in decent shape and the main problem is the tub: it is hard to step into, it is rarely used, or it takes space a larger shower would use better. Our planning range is $12,000 – $25,000; the size, the tile and whether the glass is a fixed panel or a door move the price.

If you are considering a curbless or low-threshold entry, raise it at the start. On a slab-on-grade house the floor has to drop toward the drain, which is easier to plan than to retrofit.

Option 2

When is a full bathroom remodel the better value?

A full remodel replaces the tile, vanity, fixtures and lighting together, and in a primary bath often reworks the layout: a larger walk-in shower, a double vanity, a separate toilet area. When most of the bathroom is dated, doing it once costs less than converting the shower now and replacing the vanity and floor later, because demolition, waterproofing and tile setting happen in one pass.

Our planning ranges are $10,000 – $20,000 for a hall or guest bath and $20,000 – $45,000 for a primary bath. The typical time on site is about 3–5 weeks on site once permits and materials are ready; moving plumbing or changing the layout adds time.

One more thing

Should you keep a tub somewhere in the house?

If the bathroom you are converting is the only one with a tub, think about who will use the house: young children are usually bathed in a tub, and some buyers look for at least one. Converting the tub in the primary bath and keeping one in a hall bath is a common middle path. It is a household and resale preference to weigh, not a requirement we apply.

Permits

Does a shower conversion need a permit?

Yes in practice. Since July 1, 2026, single-family owners can ask for an exemption from a building permit for work valued under $7,500, but the exemption excludes any electrical, plumbing, structural, mechanical or gas work and any property in a flood hazard area. A shower conversion replaces the valve and drain connection, so it is plumbing work and goes through your city or county building department. On a contract over $5,000, the permit office also needs a copy of the recorded Notice of Commencement before the first inspection.

The work

What happens during the job?

  1. Selections: tile, valve and trim, glass, and for a full remodel the vanity, lighting and fixtures.
  2. Permit filed and approved.
  3. Demolition to the studs and slab in the work area, with the rest of the house protected.
  4. Plumbing and any electrical changes, then the rough inspection.
  5. Shower pan and slope, waterproofing, then tile.
  6. Glass, fixtures, vanity and lighting; final inspection and walkthrough.
How to decide

How should you decide?

  1. Check whether the vanity, floor and lighting will still look right next to a new shower.
  2. Decide whether the drain and valve can stay where they are; moving them makes it a full remodel.
  3. Think about whether the house still needs a tub elsewhere.
  4. Book a site visit for a written, itemised estimate.

Sources (primary sources, checked 2026-10-16): F.S. 553.79 · F.S. 713.135. This page explains rules in general terms; it is not legal advice, and the building department for your address has the final word.

Get In Touch

Get a written estimate for your bathroom

Call (407) 993-6889 or send your project details — we’ll get right back to you.

FAQ

Common questions

Our planning range is $12,000 – $25,000: tub removal, waterproofing, sloping the floor to the drain and the glass. The size, the tile and whether the glass is a fixed panel or a door move the price; moving the drain pushes it toward a full remodel.
For a hall or guest bath, often: $20,000 is the top of our refresh range ($10,000 – $20,000). A primary bath with a walk-in shower, double vanity and glass starts around there and runs higher: $20,000 – $45,000.
Less than a full remodel when the drain stays where it is, because the vanity, toilet and floor are left alone. A full bathroom remodel typically takes about 3–5 weeks on site once permits and materials are ready. The permit review time for your address comes first in either case.
Often, but it has to be planned: the floor must slope to the drain without a step, which on a slab-on-grade house can mean recessing the shower area. It is much easier to design in at the start than to add later.
In practice yes, because it is plumbing work. Florida's under-$7,500 permit exemption for single-family homes excludes electrical, plumbing, structural, mechanical and gas work, and doesn't apply in flood hazard areas.